MLI Select, on one page.

CMHC’s MLI Select program trades commitments in affordability, energy efficiency and accessibility for leverage, amortization and recourse. The rules below follow CMHC’s September 2026 guide.

2FCalculator
3F

How it works

A project needs at least 50 points. Points come from three areas: affordability, energy efficiency and accessibility. Points can be combined across areas.

Three tiers apply: 50, 70 and 100 points. Each tier sets maximum leverage, amortization and recourse. The thresholds differ for new construction and existing properties.

4F

Points by outcome

AreaPointsNew constructionExisting property
Affordability5010% of units40% of units
Affordability7015% of units60% of units
Affordability10025% of units80% of units
Affordability+30Commitment of 20 years or moreCommitment of 20 years or more
Energy efficiency2025% better than 2020 NECB, or 20% better than 2020 NBC Tier 115% reduction from current baseline
Energy efficiency3550% better than 2020 NECB, or 40% better than 2020 NBC Tier 125% reduction
Energy efficiency5060% better than 2020 NECB, or 70% better than 2020 NBC Tier 140% reduction
Accessibility2015% accessible units, 15% universal design, or RHFAC v4.0 score of 60–79%Same as new construction
Accessibility3015% accessible plus 85% universal design, 100% universal design, 100% accessible, or RHFAC Gold (80%+)Same as new construction

Affordable means rents at or below 30% of median renter income, held for at least 10 years. Every accessibility level also requires all units to be visitable and common areas to be barrier-free under CSA B651:23.

5F

What each tier changes

TierNew constructionExisting propertyRecourse
50 pointsUp to 95% of cost · 40-year amortizationUp to 85% LTV · 40-year amortizationFull
70 pointsUp to 95% of cost · 45-year amortizationUp to 95% LTV · 45-year amortizationFull
100 pointsUp to 95% of cost · 50-year amortizationUp to 95% LTV · 50-year amortizationLimited
6F

What the tiers do not change

The minimum debt coverage ratio. It is 1.10 for standard rental regardless of points, 1.20 for other shelter types and 1.40 for non-residential space.

Lending value. The loan is limited by it as well as by DCR, and in practice these often set the actual amount, below the tier maximum.

Economic life. Amortization cannot exceed the building’s remaining economic life.

Non-residential space. It is capped at 75%.

Note

An estimate only, based on CMHC’s MLI Select guide, September 2026. Program rules change. CMHC makes the final determination, and all financing is subject to lender and CMHC approval.

8FStart a file

Have us review your points plan.

Send the plan with your pro forma. We will check it against the guide and the DCR test, and tell you which tier is realistic.

Where is the project?

Not sure? Start without a stage