Guide
How MLI Select points are earned, and what they change.
Points are a trade. You commit to outcomes in affordability, energy efficiency or accessibility. CMHC allows more amortization and, at the top tier, limited recourse. This guide follows CMHC’s September 2026 guide.
On this page
Three areas, one threshold
MLI Select is CMHC’s insurance program for multi-unit rental that rewards social outcomes. A project needs at least 50 points to qualify. Points come from three areas and can be combined.
The tiers sit at 50, 70 and 100 points. Above 100, there is no further tier. Points beyond what a tier needs add obligations without adding terms.
Affordability
A unit counts as affordable when its rent is at or below 30% of median renter income, held for at least 10 years.
For new construction, 10% of units earns 50 points, 15% earns 70 and 25% earns 100. For existing properties the shares are 40%, 60% and 80%. Committing for 20 years or more adds 30 points.
Affordability is the only area that can reach a tier alone. It is also the one that changes the income line in your pro forma.
Energy efficiency
New construction is measured against the 2020 National Energy Code for Buildings or the 2020 National Building Code Tier 1. Existing properties are measured against their own current baseline.
20 points: 25% better than NECB or 20% better than NBC Tier 1, or a 15% reduction for existing. 35 points: 50% or 40%, or 25%. 50 points: 60% or 70%, or 40%.
Energy points are earned in design and construction. The cost shows up in the budget rather than in rents.
Accessibility
Every accessibility level requires all units to be visitable and common areas to be barrier-free, under CSA B651:23.
20 points: 15% accessible units, 15% universal design, or an RHFAC v4.0 score of 60–79%. 30 points: 15% accessible plus 85% universal design, 100% universal design, 100% accessible, or RHFAC Gold at 80% or more.
What each tier changes
| Tier | New construction | Existing property | Recourse |
|---|---|---|---|
| 50 points | Up to 95% of cost · 40 years | Up to 85% LTV · 40 years | Full |
| 70 points | Up to 95% of cost · 45 years | Up to 95% LTV · 45 years | Full |
| 100 points | Up to 95% of cost · 50 years | Up to 95% LTV · 50 years | Limited |
For new construction, leverage is the same at every tier. Points change amortization and recourse.
What points do not change
The minimum debt coverage ratio is 1.10 for standard rental, whatever the points. The loan is also limited by lending value. Amortization cannot exceed the building’s remaining economic life.
This is where the trade gets real. Longer amortization lowers the annual payment, which helps the DCR test. Affordable rents lower income, which works against it. The right plan is the one where the two net out in your favour.
A worked example (hypothetical)
A hypothetical new-construction rental building of 100 units. Not a real project, and not a forecast of any outcome.
- 01
Plan A: 90 points
15 units, or 15%, at affordable rents for 10 years: 70 points. Energy performance 25% better than 2020 NECB: 20 points. The project reaches the 70-point tier: up to 95% of cost, 45-year amortization, full recourse.
- 02
Plan B: extend the commitment
Plan A, with the affordability commitment extended to 20 years: plus 30 points, for 120. The project reaches the 100-point tier: 50-year amortization and limited recourse. The cost is ten more years of restricted rents on 15 units.
- 03
Plan C: add accessibility instead
Plan A, plus 15% accessible units: plus 20 points, for 110. The same 100-point tier. The cost moves from rents to design and construction.
- 04
Then test it
Plans B and C reach the same tier at different costs. Neither guarantees a larger loan. Both still face the 1.10 DCR test and lending value, which usually decide the amount.
Note
Hypothetical example for illustration only. Not a real project, not a forecast and not advice. CMHC makes the final determination on points and terms, and all financing is subject to lender and CMHC approval.